222816
Purchaser | Esportes Erneuerbare Energien GmbH & Co KG |
Customer | Milchgut Bahnitz |
Services |
Detail engineering: control cabinets, centralized and decentralized signal aquisition and control under the use of LWL Bus. Circuit diagrams and loops in EPLAN P8. Switchboard construction/-delivery: Switch cabinet for centralized signal aquisition with SIMATIC ET200SP, operator panel for local operation, preparation for connection to the building management system with remote maintenance facility Application software/visualization: Control program: TIA V14 Assemblies / commissioning: EI&C assemblies, loop check, commissioning, trial operation, optimization |
Implementation | 2016-2017 |
Due to the extension and modification of the biogas plant with expansion of the spectrum for the use of waste heat, an absorption chiller was integrated into the plant.
The waste heat of the existing and future newly built CHPs will be used to cool the milk with waste heat energy after the milking process and to bring the drinking water to effective temperatures.