Home pageCompanyServicesReferences

References:

Chemical Industries

Environment | Water

Heat | Energy

Pharmacy | Food

Retrofit | Optimization

more

General:

Home page

Legal notice

DIN EN ISO 9001 : 2015

EAC certification

MATEC Image Brochure

Meeting | Support

Terms and conditions

130406

Purchaser Siemens AG
Customer ENKA GMBH & C0. KG, Elsterberg
   
Services Software engineering:
Migration from S5 to S7 control systems for the
- transportation system
- media stations
- pressure washing station
- boilers
- communications between control systems

Implementation of a simulation system consisting of hardware and software components to check all functions before the above substitutions are carried out.
Implementation 2006 / 2007
   

The former “artificial silk” factory which today is a viscose fiber plant wants to have state-of-the-art control systems in various areas. Installation is planned to take place during ongoing operations and/or with only short downtimes. It was absolutely necessary to simulate all functions prior to the renovation.


MATEC Elektro- und Automatisierungsanlagenbau GmbH | Friedrich-Adolf-Richter-Str. 5 | 07407 Rudolstadt | Phone +49 (0)3672 4676 0 | Fax +49 (0)3672 4676 222